NISCO stockyards go full steam ahead
Date:2023/3/24 Source: CISDI
A straight grate plant recently went operational at NISCO in China’s Jiangsu Province.
Its auxiliary stockyard 3C was also put into operation in the same period.
Both are feature stockyards created by CISDI for NISCO’s phase II, which succeeds phase I’s stockyard 2C.
Phase II achieved a fast startup and reliable operation, thanks to CISDI’s world-leading green stockyard developments - the ECIA-C eco-friendly smart stockyard, heavy-volume lump ore online screening, enclosed storage of lump ore and the green long-distance tubular conveyor.
To meet a tight six-month schedule, CISDI’s team optimised engineering and documentation methods to reduce construction design time. The construction drawings and documents enabled all onsite work to proceed smoothly.
These new, stable stockyards ensure NISCO’s production needs are fully met.